News

How to Plan Factory Load Routes: Crane Systems From Receiving to Shipping 17/11/2026 16:02
Factory Load Route and Crane Planning | Eser Vinç[+]factory load route planning[+] factory crane planning, industrial material handling, production line crane systems, outdoor gantry crane, overhead travelling crane, workstation jib crane, crane hoisting and travel units
How to Compare Industrial Crane Quotations in 7 Steps 17/11/2026 16:14
How to Compare Industrial Crane Quotes | Eser Vinç[+]industrial crane quote, overhead crane quotation, gantry crane quotation, crane procurement, crane installation cost, crane scope of supply, total installed crane cost[+]Compare industrial crane quotations by capacity, runway scope, installation, commissioning and warranty. See how to calculate the total installed cost.
How to Choose a Jib Crane for Press Die Changes 17/11/2026 16:26
Jib Crane Selection for Press Die Changes | Eser Vinç[+]press die handling crane, die change lifting system, column-mounted jib crane, wall-mounted jib crane, press die transfer stand, die handling equipment[+]Choose a jib crane for press die changes. Compare mounting options and define die weight, hook reach, lifting height and transfer stand locations.
50 TON GEZER KÖPRÜLÜ VİNÇ 18/06/2026 10:08
50 Ton Gezer Köprülü Vinç | Ağır Hizmet 50 Ton Vinç Sistemleri[+]50 ton gezer köprülü vinç teknik özellikleri, ağır hizmet çift kiriş sistemler ve Eser Vinç mühendislik çözümleri[+]50 ton gezer köprülü vinç teknik özellikleri, ağır hizmet çift kiriş sistemler ve Eser Vinç mühendislik çözümleri
PORTAL VİNÇ FİYATLARI 18/06/2026 10:05
Portal vinç fiyatları 2025 rehberi. 10 ton, 20 ton ve 50 ton portal vinç maliyetlerini etkileyen faktörler ve Eser Vinç çözümleri.[+]Portal vinç fiyatları 2025 rehberi. 10 ton, 20 ton ve 50 ton portal vinç maliyetlerini etkileyen faktörler ve Eser Vinç çözümleri.[+]Portal vinç fiyatları 2025 rehberi. 10 ton, 20 ton ve 50 ton portal vinç maliyetlerini etkileyen faktörler ve Eser Vinç çözümleri.

Categories

23/10/2023 13:53

How to Choose a Jib Crane for Press Die Changes

How to Choose a Jib Crane for Press Die Changes

A jib crane can handle repeated lifts between a die staging stand and a single press. To choose a suitable system, assess the combined weight of the die and lifting gear, the points the hook must reach, the required lifting height and the available mounting positions. If dies come from a central storage area or one crane needs to serve several presses across the production hall, an overhead travelling crane is also worth evaluating. ipv4.eservinc.com

Start by deciding where the outgoing die will be placed and where the replacement die will wait. If the outgoing die occupies the only stand beside the press, the replacement needs a separate staging point. The locations of those two points affect the jib’s required reach and slewing range.

What Does a Jib Crane Do During a Press Die Change?

A jib crane is a rotating-arm lifting system that serves a defined work area. At a press station, it can lift and lower dies between the staging stands and the machine’s die transfer point. A local jib crane can handle these short moves while the overhead travelling crane serves longer transfers across the production hall. ipv4.eservinc.com

The direction in which the die enters the press affects the layout. For example, if a die enters the press from the side, the jib crane can lower it onto a transfer stand. The movement from the stand onto the press bed depends on the machine and its die transfer equipment. Show both the crane’s set-down point and the direction of transfer on the quotation drawing so the supplier can assess how the two operations fit together.

Column-Mounted or Wall-Mounted Jib Crane?

Press station layoutCrane option to assessWhat to check on the layout drawing
The press, outgoing die stand and replacement die stand are in different directionsColumn-mounted jib craneColumn position and hook access to all three points
The press and stands are arranged along the same wall or structural column lineWall-mounted jib craneSuitability of the supporting structure and the arm’s usable slewing range
Dies are distributed from a central store to several pressesOverhead travelling crane, potentially paired with a local jib craneWhere the overhead crane sets down the die and whether the jib crane can reach that point

Eser Vinç’s catalogue includes wall-mounted jib cranes with a 180° working range and column-mounted jib cranes with up to 360° rotation. The usable range at a particular press also depends on the machine body, building columns, services and surrounding equipment. Use the layout drawing to verify which points the hook can reach in the installed position. eservinc.com

What Information Is Needed for a Jib Crane Quotation?

1. Record the heaviest die and its lifting gear

List the weight and overall dimensions of the dies the crane will handle. Include the weight of any slings, lifting beams or other below-the-hook equipment used with the heaviest die. If available, attach a drawing or photograph showing the die’s lifting points. eservinc.com

2. Mark the three points the hook needs to reach

On a dimensioned sketch, mark the replacement die’s staging position, the press transfer point and the stand for the outgoing die. Show where the hook needs to be positioned above the die at each point. This gives the supplier the information needed to assess jib reach and potential mounting positions. eservinc.com

3. Check lifting height and vertical clearance

Provide the press bed and stand heights, the die height and the space taken up by the lifting gear. If the die needs to pass a machine guard, duct or other fixed obstruction, mark its height and position on the sketch. These dimensions help establish the vertical clearance required to pick up, move and set down the die. eservinc.com

4. Specify die change frequency and mounting conditions

Share the number of die changes per day, the range of loads handled and any other lifting tasks the crane will perform. These details help define the hoist’s operating requirements. For a column-mounted jib crane, provide available floor and foundation information. For a wall-mounted jib crane, provide details of the supporting structure. The mounting arrangement is engineered for the facility. www.eservinc.com

Example Layout With One Press and Two Die Stands

At a sheet metal forming press, the replacement die is staged on the left and the outgoing die is placed on an empty stand on the right. The jib crane must reach both stands and the press transfer point. A column directly in front of the press might give the hook access to all three points while reducing the space a die transfer cart needs to approach.

Compare alternative column positions on the same drawing. For each option, check hook access to all three points, the jib arm’s usable swing and the clearance for the transfer cart. This lets the project team assess both the crane’s coverage and the space needed to carry out the die change.

Frequently Asked Questions

What jib crane capacity is needed for press dies?

Start with the combined weight of the heaviest die and its lifting gear. The suitable crane configuration also depends on the required reach, lifting height and operating frequency. Final capacity and configuration are determined from the project data. eservinc.com

Can one jib crane serve multiple presses?

Yes, provided the die transfer points for each press are within the crane’s usable working area. Where presses are spread across a production hall, an overhead travelling crane is another option. Check the actual die pick-up and set-down points when comparing coverage. eservinc.com

Can a jib crane lower a die directly onto the press bed?

That depends on the die entry direction, hook access and the press’s transfer equipment. In some layouts, the crane lowers the die onto a transfer stand beside the press. Include the machine drawing and die entry direction when requesting a quotation. ipv4.eservinc.com

What should I send when requesting a die handling crane quotation?

Send a dimensioned press layout, the heaviest die’s weight and dimensions, the lifting gear details, stand and press bed heights, and the expected number of die changes per day. Include any available floor, foundation or supporting structure information for the proposed mounting position. eservinc.com

Based in Konya, Türkiye, Eser Vinç Mühendislik designs lifting systems around facility layouts and application requirements. Share your press layout, die dimensions and operating frequency to request a project quotation for a column-mounted or wall-mounted jib crane.